Our Manufacturing Processes

Production of thermoplastic injection molding processes.

Blending Process

Material will be blend according to the products and its hardness.

Molding Process

Injection molding, Compression Molding, Molding will be done according to the product design.

Trimming Process

Flashing will be removed according to the design of the product.

Cleaning and Packing Process

Cleaning and packing will be done after all the processes.

Mission

To demonstrate excellent performance at all business level to become a wellrecognized market leader in silicone rubber molding industry.

Vision

Innovation towards betterment.

Latest Products

Latest product to be supplied to the client.

Tee Connector Housing

The Tee Connector with 630A current rating is designed for Interface C and covers voltages from 11kV/12kV to 33kV/42kV with a maximum conductor size of 300sqmm.

Bushing Cover 500KV

POC® 500kV-2000A Transformer-Circuit Breaker Bushing, Paper-Oil-Capacitor Type, Rated per IEEE C57.19.01, Bottom Connected for Air-to-Oil Applications, 23.00" Min. Oil Immersion Level.

Lower Boot Double Earthing

Some of the factories earthing is done with a single core bare copper wire or with an aluminium strip or with a copper strip in single line, but it is necessary to have a double line earthing, as an additional safety.

Who's our clients

Learn how customers all over the world are using Precise Products to do great things.